Ningbo Liantuo Metal Products Co., Ltd. · No. 88 Xingpu Road, Zhenhai District, Ningbo, Zhejiang, China 315800 info@nblato.com ·
Startseite / Aktuelles / 技术文章
技术文章2026-10-17

What Are Your Lead Times and Minimum Order Quantities?

Minimum order quantity: there is no MOQ for trial runs. Send one part or one assembly — we'll cut it. For production volumes, progressive-die stamping becomes economical, and we'll advise honestly on when it makes sense to invest in tooling.

Lead time: it depends on the job, and we confirm it with every quotation — we'd rather give you a real date than a optimistic one. As a rough guide:

- Laser-cut prototypes and small batches move fastest — cutting and bending are all in-house, so there's no waiting on subcontractors. - Stamped parts take longer on the first order (die design and build), then run fast on repeat orders — progressive dies produce thousands of parts per shift. - Welded assemblies and powder-coated parts add finishing steps; we schedule them in the same plant, not across town.

What never changes: quotes within 24 hours of receiving your drawings, and every quote states the lead time explicitly. If your project has a hard deadline, tell us up front — we'll tell you plainly whether we can hit it.

FOB Ningbo, seaworthy export packing standard on all overseas orders.

← Zurück zu Aktuelles
Einblicke

Sie haben eine Zeichnung? Wir kalkulieren sie in 24 Stunden.

Angebot anfordern E-Mail an den Vertrieb
E-Mail
info@nblato.com